Institutions: Ontario Provincial Police – London Facility

Back to Project Experience

Project Details

  • Location:
    London, ON

  • Client:
    Rasch & Hyde Limited

  • Completion:
    August 2012

Project Highlights

T2 Utility Engineers (T2ue), completed a Subsurface Utility Engineering (SUE) investigation for Rasch & Hyde Ltd. (RH) who were ultimately working for Infrastructure Ontario at two OPP facilities in London Ontario – the Exeter Site and Westminster Sites. The purpose of the investigation was to identify the utilities that were present on the site and identify the quality of information collected using the ASCE 38-02 Standard.

Using the record information provided to us from RH and the various Utilities as a reference, T2ue completed the field investigation using electromagnetic cable locate equipment to designate the horizontal alignment of utilities within the project area. Invert measurements were also collected at key sewer locations. Information was painted in the field and surveyed by RH. Composite utility drawings were created for both sites following the guidelines in the ASCE 38-02 standard.

The investigation was successful in confirming and further refining the location of the utilities within the area of concern.

Interested in getting the latest industry news? Sign up for our Newsletter!

Join Today